BANGO WIND FARM
CLIENT
Squadron Energy
LOCATION
Boorowa, NSW
SERVICES
Construction material testing, Preliminary geo investigations
ASCT BRANCH
Tumut
PROJECT DESCRIPTION
ASCT collaborated with Squadron Energy to analyse and assess construction materials for the Bango Wind Farm. During ASCT’s active involvement with the project, 46 wind turbines were constructed, ranking as the the third largest operational wind farm New South Wales.
Since its full operationalisation in 2023, this facility boasts a capacity of 244MW, and has been generating electricity at a scale capable of powering 144,000 homes and averting approximately 543,000 tonnes of carbon emissions annually.