BANGO WIND FARM

CLIENT

Squadron Energy

LOCATION

Boorowa, NSW

SERVICES

Construction material testing, Preliminary geo investigations

ASCT BRANCH

Tumut

PROJECT DESCRIPTION

ASCT collaborated with Squadron Energy to analyse and assess construction materials for the Bango Wind Farm. During ASCT’s active involvement with the project, 46 wind turbines were constructed, ranking as the the third largest operational wind farm New South Wales.

Since its full operationalisation in 2023, this facility boasts a capacity of 244MW, and has been generating electricity at a scale capable of powering 144,000 homes and averting approximately 543,000 tonnes of carbon emissions annually.