PROJECTS

While ASCT are major project specialists, we use our quality systems to ensure that every project is delivered with integrity & the same attention to detail. Even if your project is a ‘small’ one – it’s ‘major’ to you, and we’ll treat it with that respect.

We are very proud of our track record in the delivery of major projects. ASCT is familiar and practiced in the role of ‘Delivery Partner’, within major project joint-venture teams. Below are just some of the attributes we will bring to your project;

The long list of ASCT project involvement includes, the Pacific & Hume Highways, Ballina Airport, Rocky Creek Dam, Ballina & Lennox Head Sewage Treatment Plants, Beaudesert Inland Port, and many residential and industrial subdivisions.

Please browse through our recent project history; 

Back to projects

Crookwell Windfarm Project

A joint venture between BMD Constructions and Consolidated Power Projects (CPP) Australia Pty Ltd has been awarded a contract to deliver Global Power Generation Australia's $200 million Crookwell 2 Wind Farm development, located 35-kilometres north of Goulburn in New South Wales. The 91MW wind farm, once completed, will be able to produce up to 320-GWh (gigawatt hours) of renewable energy annually for homes in Canberra from 28 turbines, contributing to the capital’s 100 per cent renewable energy target.

The project is going to be delivered under a Balance of Plant (BoP) contract which comprises of the design and construction of about 23-kilometres of gravel access tracks with drainage, 28 concrete foundations for the turbines as well as construction of hardstands and crane platforms.

 

 


© Copyright 2016 Australian Soil & Concrete Testing